Announcement

Collapse
No announcement yet.

Build time automation?

Collapse
X
 
  • Filter
  • Time
  • Show
Clear All
new posts

  • midtech
    replied
    Re: Build time automation?

    Thanks Brett, this appears to be exactly what we need.

    Leave a comment:


  • Brett
    replied
    Re: Build time automation?

    I do it all the time. Checl out this link:

    http://www.setupfactory.com/webhelp/...ne_Options.htm

    See the /B option. Basically you make an INI file with the constants and pass it in on the command line. We use this on our automated builds here at IR.

    Leave a comment:


  • midtech
    started a topic Build time automation?

    Build time automation?

    We need to generate 4 different SETUP.exe's. Ideally, we would be able to run SF 4 times in a batch process, passing in different design-time constants.

    Presently, we are looking at changing the design-time constants manually and running SF 4 times. (We anticipate this number growing to 12 in the near future.)

    Can anyone think of a clever way to do this, perhaps employing the Run Before Build capability?

    Or more specifically, is there any way to establish the value of a design-time constant other than manually setting it up? Can SF be run from another process in such a way as to generate the output SETUP.exe?

    Thanks for any ideas.
Working...
X